Browse all practice questions for the NEIEP 100 Elevator Construction and Safety Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

NEIEP 100 Elevator Construction and Safety Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Which action should be taken immediately after activating the top stop and inspection switch to verify operation?
  • Which addition to a hydraulic elevator pit helps capture and return oil to the system?
  • What is the purpose of the elevation view found in the final layouts?
  • If a scaffold grade plank is used for a sill, which statement is true?
  • Which statement best describes the danger posed by the counterweight assembly when you are riding the car top?
  • What is the most serious consequence of incorrect lifting?
  • How would a class 1 fit for a bolt be described?
  • Which of the following would be drawn as a detail drawing?
  • What is the primary safety benefit of fiberglass ladders in elevator work?
  • What precaution should you take when using power tools in older buildings that do not have ground-lead outlets?
  • What is the primary safety concern when running a gasoline generator in an enclosed space?
  • Are elevator constructors permitted to ride inside a 400 lb capacity dumbwaiter?
  • What is the lowest amount of electrical current that can be fatal?
  • For each safety line attached to a lifeline, the anchor point must be capable of supporting how much load?
  • What must be installed prior to surveying the hoistway?
  • Which tissue is affected by a strain?
  • What is the purpose of a cross brace on a scaffold?
  • Which drawing would most directly show internal features of a valve assembly by slicing through it?
  • What dangerous gas is produced by a running gasoline engine?
  • A doctor diagnoses a 'strain' after a heavy lift. What type of injury is this?
  • Which safety precaution should be followed when working around electrical systems?
  • Where should hoistway access switches be installed to ensure lobby and floor accessibility?
  • Which locking device uses a second nut run up against the first which flattens when tightened?
  • The job folder typically contains which combination of documents?
  • Which section of the elevator project folder summarizes performance criteria such as speed and capacity?
  • Barriers must be installed in the hoistway pit when the hoistway door will be open by more than how many inches?
  • During rail installation, which drawing provides the most detailed installation information for rail components?
  • Each suspended scaffold installation should have a/an _____.
  • A dumbwaiter is rated to carry up to how many pounds?
  • Which document would provide information on the number and color of doors for an installation?
  • Toe boards are required to be at least how many inches high?
  • In engineering drawings, which view is typically used to show vertical dimensions such as depth?
  • Which statement about using scaffold grade planks for sills is true?
  • What is the first thing you must do before performing any service on an escalator?
  • The 'drop of governor to car' measurement is taken from the centerline of which components?
  • What type of extinguisher is required in the machine room?
  • After applying a lock and a tag before maintenance, what step should you take?
  • What type of fire extinguisher is required in the machine room?
  • During maintenance, the final safety check before proceeding is to verify absence of power with appropriate test equipment.
  • What must you verify before getting on top of a dumbwaiter?
  • Before assembling scaffolding, the components should be inspected for
  • When moving heavy parts or machinery, which safety practice is most important?
  • What is the maximum capacity of a dumbwaiter?
  • Which of the following best describes the final layout drawing?
  • What is the immediate action if the work area lacks adequate lighting for a planned task?
  • Under OSHA safety standards, scaffolds that exceed how many feet in height must be designed by a professional engineer?
  • What is the simplest locking device used to prevent loosening due to vibrations?
  • When lifting heavy objects, what is the recommended technique?
  • On the plan drawing, the main guide rails are shown in relation to the location of what?
  • At which point on the lifeline should your lanyard be attached?
  • What are two types of mechanical drawings used in elevator installations?
  • Where are barriers required when working on a moving walk?
  • What is the most serious consequence of incorrect lifting?
  • What is the acceptable tolerance (in inches) for the installation of guide rails on a job where the layout drawing does not specify a maximum or minimum dimension?
  • You are installing a V-belt drive pulley on a 40 hp motor for a hydraulic pump unit. What type of fastener is needed to lock the pulley to the motor shaft?
  • On architectural drawings, which view shows the layout as seen from above?
  • Which statement about carbon monoxide from gasoline engines is true?
  • What term is used to describe a body harness used with a shock absorbing lanyard?
  • Which of the following actions best reduces the risk when servicing hoist ropes?
  • In a mechanical drawing, which symbol would refer to diameter?
  • With a base of 5 feet by 7 feet and a 4:1 height-to-base ratio, what is the maximum height of the first tie?
  • Ties used in securing components must be capable of resisting which loads?
  • With a 5' x 7' base and a 4:1 ratio, what is the maximum allowable height of the first intermediate tie from the ground?
  • Before using the elevator car sling as a running platform, which systems must be operational and tested?
  • How many possible views are available from drawings using orthographic projections?
  • When a roller bearing is pressed onto a shaft, what type of allowance does the shaft have?
  • You arrive at the machine room to replace a thrust bearing and the lights are not working. What should you do?
  • What are the three levels of reaction to an electrical shock?
  • Before maintenance on elevator equipment, which procedure ensures energy cannot be re-energized?
  • A ladder is set to access a landing 12 feet above the base. What is dimension B?
  • Which organization's code prohibits storing anything on top of the elevator car?
  • The anchor point for a lifeline must be capable of supporting _____ for each safety line attached to it
  • How do you determine the correct angle from the vertical for placing a ladder?
  • The secondary brake on winding drum must be manually reset once it trips
  • What is the policy regarding carrying a screwdriver in your pocket on a car top?
  • In a ladder setup for accessing a landing 12 feet high, dimension B is measured as:
  • Which tool is used to confirm vertical alignment of the hoistway during setup?
  • Before shortening a governor rope, which safety steps should be taken?
  • The four-to-one ratio used to determine tie height uses which base dimension?
  • What is the primary safety concern addressed by placing barricades before escalator service?
  • What is done with pipe threads to ensure a good seal?
  • What is the scale of a drawing when marked 1'=1"?
  • Which drawing method uses perpendicular projections to show an object's views from multiple directions?
  • Any scaffold or accessories damaged shall be _____.
  • What type of screw would be used to hold a pulley on a shaft?
  • For a 10-foot scaffold plank, what minimum overhang over its supports is required if movement is not restrained?
  • Identify the device that may be found in the hydraulic elevator pit used to grip a plunger.
  • On installation drawings, which dotted line represents a part in motion or a part in an alternative position?
  • Dumbwaiter cab enclosure designed to transport people?
  • Which two major categories of construction drawings are used in the elevator trade?
  • When using a suspended scaffold, when is it ok to unhook your fall arrest?
  • You are installing rails in a new building. Which drawing will you reference?
  • What makes a hydraulic elevator pit dangerous?
  • What is the primary purpose of screwjacks in scaffold setup?
  • What is the purpose of locking out the main disconnect switch before checking the oil reservoir?
  • If an escalator delivered weighs 5,700 kilograms, what is the correct US customary weight?
  • In a traction elevator pit, which hazard is often referred to as the silent killer?
  • What is the distance from the crest of one thread to the crest of the next thread called?
  • In fit terminology, a loose fit corresponds to which class of fit?
  • Door rollers can be held in place with through bolts. What other means of attachment can accomplish this?
  • What is the required height for an OSHA approved barricade?
  • Which class of screw thread has the greatest number of threads per inch for a given size?
  • Which hazardous substance is commonly associated with older building fireproofing materials?
  • Which statement best describes lockout and tagout procedures?
  • Which document provides safety information on chemicals used during elevator maintenance?
  • Which document shows all major parts of an installation?
  • Which type of drawing will show a view of a part as if it were cut?
  • Why did the mechanic instruct the apprentice not to run a gasoline generator in an enclosed parking garage?
  • Which document lists the hazards associated with a chemical substance?
  • Which drawing type is defined as viewing an object straight on from multiple sides with each view at right angles to the adjacent sides?
  • How often must scaffolding be inspected before it can be used?
  • You must order enough wire to complete installation of a duplex. Where would you find the information that would determine how much wire is needed?
  • A mechanic needs to ride on the car top, but a top-of-car operating device is not available. What should the mechanic do?
  • What is the function of a drip collection pan in an elevator hydraulic pit?
  • Where would an elevator constructor find information about the locations of entrances and hall fixtures?
  • When replacing typical rollers on guides, what is the appropriate tool and fastener to be used?
  • What type of locking device uses a second nut run up against the first which flattens when tightened?
  • Elevator constructors should only use which type of drawings?
  • Where would an elevator constructor find information pertaining to platform dimensions?
  • In hydraulic elevator systems, what physical feature supports the car when it is not moving?
  • What device must be in working condition in order to use an elevator car sling as a running platform?
  • Which statement correctly identifies the three factors for electrical injury severity?
  • During elevator work where the public is present, what is the minimum barricade height to protect workers?
  • What are the two most obvious dangers in the machine room?
  • What is called the 'silent killer'?
  • If a scaffold lacks a guardrail system, at what height is fall protection required?
  • Which combination of hazards is most commonly associated with public elevator accidents?
  • What precautions should be taken when the overhead machine room floor is being poured?
  • Under ASME A17.1, at what pit depth is a pit ladder required?
  • Which thread type is specified for achieving a proper seal in piping installations?
  • When normal voice communication cannot be used what is required?
  • What is the minimum strength of the top rail of a guardrail system for a suspended platform?
  • Before entering an escalator truss after completing lockout/tagout, which safety step must be performed?
  • Which of the following statements best describes the purpose of an emergency plan for suspended scaffold installation?
  • A detail drawing would typically depict which of the following components?
  • Which drawing would depict a component with multiple views, including top, front, and side perspectives?
  • If a scaffold accessory is damaged, what is the required action prior to continued use?
  • Who is responsible for barricades being kept in place on a job site?
  • Which safety systems must be operational and tested before using the elevator car sling as a running platform?
  • Which conveyance system uses energy applied by means of a liquid under pressure?
  • What safety device might you encounter in a hydraulic elevator pit?
  • Which washer type is specified for governor mounting when plain lockwashers are not used?
  • Which organization requires information and training on chemical health effects?
  • For purpose of dimensioning, what type of lines are used on installation drawings?
  • If you encounter a serious OSHA violation during a job site inspection, who should you notify first?
  • Which of the following attachments is commonly used to retain door rollers when through bolts are not used?
  • What type of materials are typically found in the job folder?
  • A scaffold must support its own weight plus at least how many times the maximum intended load transmitted to it?
  • Which describes a hydraulic elevator?
  • When looking at a plan view drawing, what direction are you viewing from?
  • Scaffolding cross braces can be used as a mid rail in a guard rail system.
  • Screwjacks are used for which purpose?
  • If you are installing additional lighting in the hoistway, what type of extension cord should you use?
  • You're helping a mechanic disassemble a hydraulic control valve. Of the following, which drawing would be the most helpful to reference?
  • In a conventional hydraulic elevator pit, which item would you typically find along with spring buffers, limit switches, and cylinder head packing?
  • What is a walk-in pit?
  • How many means of braking must a hoist have?
  • In the elevator industry, fiberglass ladders are most commonly used because they are non-conductive.
  • When is it safe to check the tension of hydraulic elevator belts?
  • After activating the top of car stop switch and the inspection switch, what is the next step to verify they work?
  • How are threads specified on metric bolts?
  • What method should an elevator constructor use to check the well hole depth?
  • Which term describes an architectural drawing that shows three sides at once?
  • Which drawing type would a constructor rely on as the final approved source?
  • For installing a bearing on a machine with a class #7 fit, which two items are necessary?
  • Many older buildings contain fireproofing materials made of which hazardous substances?
  • What is the safest way to lubricate hoist ropes?
  • In a hydraulic elevator, which component provides the lifting force?
  • What is the function of a ground fault circuit interrupter?
  • Prior to lubricating a governor tension sheave in a traction elevator pit, which safety action is required?
  • What must elevator constructors do before using chemical solutions or cleaning fluids?
  • The drop of governor to car measurement is taken from which reference point?
  • What is the maximum height-to-base width ratio before needing tipping restraint with outriggers?
  • If the scaffold base is 5 ft by 7 ft, what is the maximum height of the first tie?
  • On metric bolts, threads are specified by which measurement?
  • What are the main hazards in the machine room of a heated traction elevator?
  • What is the minimum number of braking means that a hoist must have? (variant)
  • A walk-in pit is distinguished by having what feature?
  • On installation drawings, which line type represents a feature in motion or an alternate position?
  • Who is ultimately responsible for ensuring adequate lighting at a work site?
  • While working on a moving walk, where are barriers required?
  • Which conveyance system uses suspension means to move a car up or down a hoistway?
  • For mounting specifications for a governor, which type of washer is required?
  • Which view shows vertical locations and dimensions of elevator components?
  • What is the front or side view drawing of a hoistway called?
  • For a temporary overhead protection platform, what is the minimum thickness of wood planking?
  • What safety factor is required for suspended scaffold?
  • The hazard information document for chemical substances is commonly called what?
  • If you cannot communicate by voice during suspended scaffold work, what must you use?
  • A mechanic should replace an escalator comb or comb plate when which condition is present?
  • Which three factors determine the severity of injury from electricity?
  • Which component is called the 'silent killer' in elevator safety?
  • In technical drawings, what is another term for a plan view?
  • When you find a safety or OSHA violation during inspection, who should you notify first?
  • If a drawing is labeled 1'=1", what is the scale expressed as a fraction?
  • What is the maximum allowable platform deflection between supports?
  • Which drawing type would be considered the most authoritative for the layout of an installation after final approval?
  • Which drawing is used to reveal interior features of a component by slicing it along a plane?
  • Why must you place the hydraulic elevator car on support posts before servicing the packing head?
  • What force must an approved barricade withstand in the direction of the hoistway?
  • When a carpenter uses a powder activated tool to anchor wall track, what precaution should the mechanic take?
  • Which action best reduces exposure to electrical hazards in the machine room of a heated traction elevator?
  • What statement best describes a layout drawing?
  • If working from a scaffold without a guardrail system, at what height is fall protection required?
  • Which safety feature is specifically referenced as required for service from the car top on a dumbwaiter?
  • What is the minimum required strength for the top rail of a guardrail system?
  • Which component provides horizontal stability for scaffold frames?
  • Including outrigger supports, if used, what height to base width ratio is allowed before requiring tipping restraint?
  • The center line of the top rail of a guard rail must be?
  • If you are unsure whether a hoistway is a permit-required confined space, where can you find information?
  • What is the best way to communicate with coworkers in the machine room while they work in the pit?
  • Which organization requires information and training on the long- and short-term health effects of the chemicals workers handle?
  • Which term describes a drawing that presents all three spatial dimensions of a component for general understanding?
  • A 10 inch wide, 10 ft long scaffold plank rated at 50 psf is used. What is the allowable load rating for the plank?
  • What are the two most common causes of accidents to the general public on elevators?
  • Which document would you consult to determine wire routing and length for a duplex installation?
  • When installing pipe, what type of threads would you use to create a proper seal?
  • Public safety is the elevator constructor's responsibility during which activities?
  • Which statement about toe boards is true?
  • What part of the job folder would contain information regarding elevator speed, capacity, and loading class?
  • Where would you find hoistway access switches mounted?
  • When a mechanic must stand on the car top of a dumbwaiter during a trouble call, which safety feature should the dumbwaiter be equipped with?
  • What are the two major categories of construction drawings used in the elevator trade?
  • Which term describes the allowance on a shaft that results in a looser assembly under press-fitting?
  • Which view shows the pit depth on the drawing?
  • What information is typically provided in a job folder?
  • What is the primary purpose of the top rail in a guardrail system?
  • What is the specified capacity of the dumbwaiter mentioned in relation to rider restrictions?
  • What is the maximum allowable height for the top rail of a guardrail system?
  • What is the tolerance accepted in the elevator industry of not specified?
  • When tying a scaffold to another structure, what must be determined first?
  • A construction team receives a job folder. What does it contain?
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy